Laboratory Construction: Biosafety Levels, Cleanrooms, and the Specialty Infrastructure Behind Modern Research
Laboratory construction is specialized work with specific infection control, contamination prevention, specialty gases, fume hoods, specialty air handling, and biosafety level (BSL) classifications that drive design. Lab projects combine institutional and specialty construction with scientific programming requirements. Contractors successful in lab work understand the technical complexity; those unfamiliar consistently underestimate what lab construction requires.